The Cata processing facility has a capacity of 36,000 tonnes/month.
High-grade, epithermal vein, underground silver-gold mine that has a strike length of over 4km.
Mineral Resources
Tonnes (t)
Ag (g/t)
Ag (oz)
Au (g/t)
Au (oz)
AgEq (g/t)
AgEq (oz)
AuEq (g/t)
AuEq (oz)
Total Measured
166,262
255
1,362,426
1.81
9,681
409
2,185,272
4.8
25,709
Total Indicated
85,404
240
658,767
1.68
4,600
382
1,049,757
4.5
12,350
Total M&I
251,666
250
2,021,193
1.76
14,280
400
3,235,029
4.7
38,059
Total Inferred
220,760
225
1,597,357
1.95
13,873
391
2,776,596
4.6
32,666
The disclosure above is a historical estimate. A qualified person has not done sufficient work to classify the historical estimate as current mineral resources or mineral reserves; and the issuer is not treating the historical estimate as current mineral resources or mineral reserves; Silver Equivalent calculated using 85:1 Ag:Au ratio; Effective Date: July 31, 2021